
Welcome home from Tom McHugh Construction! This home is already underway, with a completion date of 9/12/2022. The Cherry floor plan is a split bedroom ranch design with upgrades already added- LVP flooring , 3-panel poplar doors, 1 egress window, insulated garage doors, trey ceiling in master, basement set up for a future bathroom, and central AC.
50259047
Single Family, Other
3
2 Full
2022
Outagamie
City of Kaukauna
0.33
Acres
Municipal Public Water
Vinyl siding
Municipal Sewer
Loading...
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Loading...
Loading...